Bridging the Gap on the Chesterfield Canal

    Full Video – https://youtu.be/J_ii_AQNWdk

    Please Sponsor me Here for my Walk 1,000 Miles Challenge for the @wiltsberkscanaltrust

    https://www.justgiving.com/page/stephen-court-1707940484073

    Join this channel to get access to perks:
    https://www.youtube.com/channel/UCYByDH3Jbos0kFWrvIlmzYw/join

    Join me in Derbyshire as we follow the beautiful chesterfield canal as the restoration continues in the west, aiming to plug the gap and join the rest of the restored Chesterfield Canal as it winds its way down to the River Trent.

    Today we are at Staveley looking at the basin, lock and bridge and follow down through on the Staveley town deal. Under the massive road bridges and away from the old open cast line which now holds the basin. Here several railways crossed the canal which are now abandoned and the planned HS2 depot was to cross. Now the trans pennine trail needs to cross the canal at a new footbridge that takes the cycle way across the canal. We see the spade in the ground for the project as Dr Hardy starts the project which should see a bridge this year. Then the canal follows down onto puddlebanks which we will see very soon on the channel!

    Fund Britains Waterways petition – https://www.change.org/p/fundbritainswaterways

    All drone footage shot with a DJI mini 3 Pro.

    All camera footage shot with an Insta360 RS ONE Inch with Rode Go mic and Lavalier.

    Fund Britains waterways – https://waterways.org.uk/waterways/sites/fund-britains-waterways-overview

    Keep canals alive (canal and river trust) – https://canalrivertrust.org.uk/support-us/our-campaigns/keep-canals-alive

    Rail Map Online – https://www.railmaponline.com

    Waterway Routes – https://www.waterwayroutes.co.uk

    Please follow me on socials

    Twitter/X – https://twitter.com/CourtAboveCut?fbc…
    Instagram – https://www.instagram.com/Courtabovethecut
    Facebook – https://www.facebook.com/profile.php?id=100089090800654
    Threads – https://www.threads.net/@courtabovethecut
    TikTok – https://www.tiktok.com/@courtabovethecut?is_from_webapp=1&sender_device=pc
    BlueSky – https://bsky.app/profile/courtabovethecut.bsky.social
    Email – CourtAboveTheCut@yahoo.com

    there’s only 9 mies left to this one uh which covers some difficult terrain you’ve got to get through there’s quite a long tunnel that needs to be re redone the old one can’t be used uh there’s a hous in EST State built further up as well which built on the line despite a lot of objections so they need to get around and drop in and out of a lake there with locks uh which might be part of a river uh R link as well but here’s here’s a uh Town lock and what we’re here to see is everything below here and what’s happening so I believe this lock was done at the same time as the Basin so I put the date is 2011

    1 Comment

    Leave A Reply