Bridging the Gap on the Chesterfield Canal

    Full Video – https://youtu.be/J_ii_AQNWdk

    Please Sponsor me Here for my Walk 1,000 Miles Challenge for the @wiltsberkscanaltrust

    https://www.justgiving.com/page/stephen-court-1707940484073

    Join this channel to get access to perks:
    https://www.youtube.com/channel/UCYByDH3Jbos0kFWrvIlmzYw/join

    Join me in Derbyshire as we follow the beautiful chesterfield canal as the restoration continues in the west, aiming to plug the gap and join the rest of the restored Chesterfield Canal as it winds its way down to the River Trent.

    Today we are at Staveley looking at the basin, lock and bridge and follow down through on the Staveley town deal. Under the massive road bridges and away from the old open cast line which now holds the basin. Here several railways crossed the canal which are now abandoned and the planned HS2 depot was to cross. Now the trans pennine trail needs to cross the canal at a new footbridge that takes the cycle way across the canal. We see the spade in the ground for the project as Dr Hardy starts the project which should see a bridge this year. Then the canal follows down onto puddlebanks which we will see very soon on the channel!

    Fund Britains Waterways petition – https://www.change.org/p/fundbritainswaterways

    All drone footage shot with a DJI mini 3 Pro.

    All camera footage shot with an Insta360 RS ONE Inch with Rode Go mic and Lavalier.

    Fund Britains waterways – https://waterways.org.uk/waterways/sites/fund-britains-waterways-overview

    Keep canals alive (canal and river trust) – https://canalrivertrust.org.uk/support-us/our-campaigns/keep-canals-alive

    Rail Map Online – https://www.railmaponline.com

    Waterway Routes – https://www.waterwayroutes.co.uk

    Please follow me on socials

    Twitter/X – https://twitter.com/CourtAboveCut?fbc…
    Instagram – https://www.instagram.com/Courtabovethecut
    Facebook – https://www.facebook.com/profile.php?id=100089090800654
    Threads – https://www.threads.net/@courtabovethecut
    TikTok – https://www.tiktok.com/@courtabovethecut?is_from_webapp=1&sender_device=pc
    BlueSky – https://bsky.app/profile/courtabovethecut.bsky.social
    Email – CourtAboveTheCut@yahoo.com

    so the stavely town deal is a25 million deal and that takes the canal another half a mile from where we are behind us there and takes us up to something called the puddle Banks which will come on in a later video this takes us through this area here you’ve got the big new road bridge going across the top and then you’ll start to see work going on now this is an area absolutely crisscrossed with foot paths and Old Railway routes which are now cycle paths and you got the transpan tra which runs across and they need to keep that open so part of this deal is to pay for a new bridge going across and that’s what we’re here to see today

    1 Comment

    Leave A Reply