With years of traffic troubles ahead, Providence is looking at long-term ways to alleviate congestion from the Washington Bridge replacement.

    https://turnto10.com/news/local/mayor-mulls-bike-lane-changes-as-lengthy-bridge-project-looms-brett-smiley-josh-estrella-washington-traffic-infrastructure#

    —–

    NBC 10 WJAR is Southern New England’s leading news station, covering news, politics, sports and weather in Rhode Island, Southeastern Massachusetts and Eastern Connecticut, including Providence, Central Falls, Cranston, East Providence, Newport, Pawtucket, Warwick, Woonsocket, Attleboro, Fall River, New Bedford, Taunton and Cape Cod, and surrounding communities.

    Our homepage is at https://turnto10.com
    Like us on Facebook at https://facebook.com/nbc10
    Follow us on X at https://x.com/nbc10
    Follow us on Instagram at https://instagram.com/nbc10wjar

    Download the NBC 10 News app for iOS at
    https://apps.apple.com/us/app/nbc-10-wjar/id1022872963

    Download the NBC 10 News app for Android at
    https://play.google.com/store/apps/details?id=com.cellit.cellitnews.wjar&hl=en

    Report news to NBC 10 at 401-455-9105 or email news@wjar.com

    Share your images and video with NBC 10 at https://turnto10.com/chimein

    GOOD EVENING. EVERYONE THANK YOU SO MUCH FOR JOINING US ON THE SAME PATRICK STAY. I’M SAM READ WITH YEARS OF PROJECTED TRAFFIC TROUBLES. AHEAD PROVIDENCE IS LOOKING AT A LONG TERM WAY TO ALLEVIATE CONGESTION FROM THE WASHINGTON.

    BRIDGE REPLACEMENT THAT COULD INCLUDE CHANGING OR REMOVING BIKE LANES. NBC 10S KATIE BENOIT HAS MORE AND WE LEARNED A FEW DAYS AGO THAT THE WESTBOUND SIDE OF THE WASHINGTON. BRIDGE WILL HAVE TO BE DEMOLISHED AND REBUILTS.

    NOW SURROUNDING CITIES ARE TRYING TO COME UP WITH THE PLAN TO HELP WITH TRAFFIC. BACKUPS, IT’LL BE YEARS UNTIL DRIVERS WILL BE ABLE TO TRAVEL OVER THE WESTBOUND. SIDE OF THE WASHINGTON BRIDGE. THE TRAFFIC SITUATION CONTINUES

    TO BE A NIGHTMARE FOR MANY. DO EVERYTHING IN MY POWER TO AVOID IT. CAUSING DELAYS IN SPOTS LIKE DOWNTOWN PROVIDENCE FOR SEEING TRAFFIC IN PLACES THAT. I WOULD HAVE ANTICIPATED ON ALL AVENUE AS PEOPLE TRY TO MAKE A BYPASS.

    ON THEIR OWN TRYING TO GET ON TO 95 NORTH BACKS UP BECAUSE THEY’RE STUCK. CAN’T GET A CROSS BECAUSE PEOPLE ARE TRYING TO GET ON THE 195. AND SO WE’RE GONNA BE MAKING SOME INFRASTRUCTURE CHANGES. NOW THAT WE KNOW NOW THAT WE

    KNOW THIS IS GOING TO BE RELATIVELY LONG. TERM ON SUNDAY PRESS SECRETARY. JOSH TOLD NBC 10 IN PART. IT’S TOO EARLY TO SAY WHAT CHANGES WILL NEED TO BE MADE. AND WHERE? BUT AT THIS ALL OPTIONS REMAIN

    ON THE TABLE, THE CITY CONFIRMS THAT CHANGING. OR REMOVING THE BIKE LANES ON SOUTH WATER. STREET IS THE POSSIBILITY. THEY SEEM PRETTY EMPTY THE ROAD NEAR THE PEDESTRIAN BRIDGE CAN BACK UP WITH TRAFFIC. AS PEOPLE TRY TO GET ON I-195

    EAST NEAR INDIA PARK. THE GOOD SIDE OF THE BRIDGE TAKING ON THE TRAFFIC FROM THE BAD SIDE. I CAN SEE YES WHY IT WOULD BE A GOOD IDEA. JUST WHILE THE BRIDGE IS BEING WORKED ON THE IDEA.

    MEETS MIXED CRITICISM FROM DRIVERS AND BIKERS. I THINK THAT IT IS NOT A USEFUL WAY OF THINKING ABOUT THE TRAFFIC PROBLEM. I THINK THAT THIS BIKE LEAN IS A VITAL PIECE OF INFRASTRUCTURE. FOR PEOPLE AROUND HERE.

    I AM ALWAYS ABOUT LIKE TRYING TO MAKE IT MORE EFFICIENT FOR US. TO GET OVER THE BRIDGE FASTER BECAUSE IT’S TAKING US LONGER AND LONGER TO GET. THERE TO WHERE IT’S LIKE, NOT JUST 8 HOUR WORK DAY.

    IT’S BECOMING LIKE A 101,112 HOUR WORK DAY. SOME DRIVERS TELL ME THEY’D LIKE TO SEE MORE POLICE OFFICERS HELPING. DIRECT TRAFFIC

    1 Comment

    Leave A Reply